First the daily business operations, then the tariff
One company can shift its charging times. Another has to produce precisely when orders and staffing levels dictate. The same market price looks different for each. That's why the decision for a dynamic electricity tariff begins with a simple question: Which parts of our consumption can we actually change – without compromising quality, deadlines, or safety?
With a dynamic electricity tariff, the exchange-linked portion of the energy unit price changes throughout the day. The energy unit price is the amount per kilowatt-hour consumed; the offer specifies which other components it includes. The Federal Network Agency lists a smart metering system as a prerequisite for such contracts. This connects the meter to a communication unit for data transmission.
If your business already has registered load metering (RLM) that records consumption over time, have its suitability for the offered product confirmed: Which measurements are required, who transmits them, and are there any additional costs? A digital display alone is not sufficient proof. Basis: Federal Network Agency on dynamic electricity tariffs.
Your consumption determines your average.
The simple monthly average of an electricity exchange price curve is not yet a procurement price for your company. For that, the prices must be weighted by the quantities consumed. A company that consumes a lot during expensive periods will arrive at a different result than a company that focuses on cheaper periods.
A freely chosen calculation example: In two equally long time periods, the pure energy prices are €0.08 and €0.20/kWh. If 100 kWh are consumed first and then 300 kWh, the cost for 400 kWh is €68 – that is, €0.17/kWh. The unweighted average of the two prices would be €0.14/kWh. Other price components are not included in this example.
The impact of shifting consumption can be illustrated with the same example: If 100 kWh can be shifted from the expensive to the cheaper time slot, 200 kWh will be used in each slot. The energy costs will then be €56 instead of €68. This €12 difference is a calculated result based on the chosen assumptions. Whether the change is worthwhile in practice also depends on the effort involved and the additional costs.
Flexibility must work in the workplace
Create a short to-do list: Which systems can be time-controlled, who approves changes, and what are the limits? A vehicle must be charged in the morning. Refrigerated goods require reliable temperatures. A system must not suffer additional wear and tear from frequent starts. These operational conditions take precedence over price considerations.
First assess the effect using existing load-profile data. Compare unchanged operation with realistically shifted loads. Include controls, metering, support and possible additional peak loads in the calculation. Technically shiftable consumption is not yet a proven economic benefit.
What should be included in the contract and the budget
Ask for the pricing formula to be explained using a specific billing day. The price index identifies the exchange price series used; the billing interval determines which price is assigned to which consumption volume. Also check surcharges, fixed charges and the handling of missing readings. A negative exchange price does not automatically mean a negative total price. Grid charges, levies and contractual costs still apply. The basics and market trends are explained in Spot and futures markets.
The decision should include a scenario with significantly higher market prices. How would it affect the month, liquidity and the costing of your products? Assign a responsible person and a review cycle. A fixed price may suit budget planning better for the price components it covers; the specific contract must show which items are fixed.
Make the comparison ready for a decision
For a fair comparison of offers, both models need the same consumption and delivery period. Compare the load profile, planned operational changes, and contract offers side-by-side. Request to see the annual figures and highlight months with a high financial burden, and document the required support effort. For fixed production times, further hedging may be advisable. For reliably available flexibility, a more detailed dynamic model calculation is worthwhile.
A combination of price-hedged and variable quantities is also a possible contract structure. The necessary rules for this are explained in Making Energy Prices Predictable. For an assessment of your company’s situation, the next step is to Commercial Electricity Procurement with OPTUM.