Network load is a defined system parameter.
When factories, offices and households draw electricity from the grid, this is reflected in grid load. The SMARD series used here represents this demand for Germany under a defined scope, including grid losses and excluding the charging power of pumped-storage plants. It is therefore neither your business’s connection capacity nor simply the sum of all consumption bills. The Federal Network Agency explains this definition in relation to generation, cross-border transmission and pumped storage.
For this calculation, imports are added to net electricity generation; exports and the power used to pump water into pumped-storage facilities are subtracted. The chart uses the published series and does not calculate a new series from individual power plant data. When comparing data from other publications, first check the geographical area, period and calculation basis. Similar labels do not guarantee the same measured quantity.
What remains after wind and photovoltaics
SMARD defines residual load as the grid load minus the feed-in from photovoltaics, onshore wind, and offshore wind. The graphic shows the published residual load series directly. It is not recalculated here from rounded individual values. This preserves the source assignment; rounding discrepancies may occur when recalculating the values yourself.
A simplified example for the same time interval: With a grid load of 50,000 MW and a combined wind and solar feed-in of 30,000 MW, the residual load is 20,000 MW. This figure describes the demand remaining after subtracting these two generation groups. It does not yet indicate which other plants or electricity imports will cover it.
Negative residual load is possible. Under this definition, it means that the wind and solar feed-in considered exceeds grid load. This does not automatically give your company a negative electricity supply price. Likewise, positive residual load does not mean exclusively fossil generation. Other generation sources, storage and exchanges with neighbouring countries are also part of the electricity system.
Consciously select time period and unit
The data source provides energy quantities in megawatt-hours (MWh) per quarter hour. The graph divides these quantities by 0.25 hours to show the average power in megawatts (MW). For longer periods, full daily averages are used; in the daily view, the quarter-hours remain visible. A daily average can obscure positive and negative phases. Therefore, a more detailed view is needed to determine when something occurred.
Network load and residual load are displayed on the same unit scale. Different line patterns, labels, and an accessible data table complement the colors. The values can also be read using the arrow keys and the selection controller. Missing data remains visible as gaps and is not reinterpreted as consumption values.
Your remaining electricity needs are a separate question
The remaining grid electricity purchased by a business with its own PV system depends on its consumption and generation profiles. National residual load cannot replace this site-specific calculation. For the combination of self-supply and external supply, our article on PV, storage and a contract for remaining grid electricity explains the key questions.
A company’s residual electricity calculation needs measurements or plans for its own site: consumption, direct use of PV generation, storage and grid imports. The national curve helps assess the market but does not replace this data. The accompanying spot-market article therefore separates historical price observations, planning and contract decisions.
Published data remains a verifiable basis.
The displayed data status applies to the series actually stored. Unpublished intervals, technical failures, and incomplete days may limit the usable selection. A data retrieval every three hours is planned. The decisive factor is the last successful data set displayed, not solely the planned frequency. In case of errors, any existing valid data set remains visible; OPTUM does not supplement missing source values with its own estimates.
Source: Federal Network Agency | SMARD.de, CC BY 4.0. The definitions and rounding principles are described in the SMARD User Manual. The analysis is a market assessment and not an individual consumption or price forecast.
The next step is to connect these findings to your own procurement: assess your purchasing model with OPTUM, based on your site’s load profile and planning goals.