Understand process heat.
Know the requirements.

Each batch needs the right temperature, each drying process needs time. We plan your electricity and gas supply based on your processes – so that energy costs become predictable and your procurement matches your production.

Read article ↓All articles →
Editorial illustration on the topic of process heat in companies: Check requirements before procurement
OPTUM / PRACTICEPROCESS HEAT

Not every heat requirement follows the weather.

A factory building requires more heating energy in winter. A drying process, on the other hand, can run almost unchanged even in July. Combining both consumption figures into a single annual number makes it difficult to understand why the gas bill rises or falls. This distinction is relevant for procurement: production volume and outside temperature affect different aspects of demand.

First, create a simple overview of the heat-consuming processes. It's not necessary to equip all systems with new meters immediately. Start with available meter readings, operating times, and system documentation. Clearly indicate which values are measured and which are only estimated.

Boilers, heat exchangers and recovery systems supply an industrial production line with process heat
Process heat requires a combined consideration of temperature, power, and operating time.

Record four pieces of information per process

  • Uses: such as cleaning, drying, hot water or material heating.
  • Temperature: required level and permissible fluctuation.
  • Time: Continuous operation, shifts, individual batches or seasonal use.
  • Quantity: Required useful heat and fuel used, each with indication of the measuring point and the unit.

Heat demand and fuel consumption are not the same thing. Due to losses during heat generation and distribution, 100,000 kWh of gas yields less than 100,000 kWh of usable heat for the process. Without knowing these losses, an alternative technology cannot be accurately compared.

Add heating and standby phases. For example, a dryer may require heat to reach its operating temperature even before the first load. Check with the technical team what lead time is needed and whether the system is being kept warm longer than necessary.

Waste heat needs a suitable consumer.

Waste heat is only usable if the temperature, timing, quantity, and distance match the heat demand. Heat generated at night does not automatically replace the demand of a system operating during the day. A storage system can be part of a solution, but it brings its own losses, costs, and space requirements.

First the heat balance, then the technology

Enter the source and demand on the same timeline. A large annual quantity alone does not prove an economically viable match.

Germany’s economic affairs ministry identifies waste-heat recovery and more efficient equipment as options for businesses. Information is available on its energy and resource efficiency in business page. Whether a particular measure qualifies for funding must be checked separately against the conditions applicable at that time.

A different energy source changes both contracts.

If a gas-fired process is partially electrified, gas purchases may decrease while electricity purchases increase. This change must be taken into account for both supply contracts at the appropriate time. A one-month trial run is different from an ongoing conversion starting at the beginning of the year. Therefore, for each change, record the expected start date, the reduction in gas volume, and the additional electricity quantity. These values are not directly interchangeable: the efficiency and operating mode of the new technology will affect the overall balance.

Also check whether an existing system is retained as a backup. In that case, basic costs and maintenance may still apply. The article on heat pumps and electricity procurement in commercial settings explores one possible technical approach without assuming it applies to every temperature range.

A process overview leads to a better inquiry.

For energy inquiries, current demand, planned changes, and uncertainties can now be specified separately. This improves the comparison of commercial gas offers. Include information on the production volume used in the planning and any changes that have already been decided upon. If an additional shift is added or the plant start-up is delayed, this change must be incorporated into the consumption forecast in a timely manner.

Talk to OPTUM about your changing energy needs. Bring your latest gas and electricity bills as well as an overview of your planned process changes. Based on this information, we will discuss with you the quantities and delivery periods to be considered for the next round of quotes. The technical design remains the responsibility of your specialist planning department.

SUITABLE FOR YOUR QUESTION

Delve deeper into what will move you forward.

Procuring commercial gas correctly: Comparing offers on a level playing fieldChecking commercial gas offers: Aligning price components, CO₂ costs, quantity rules, and contract duration on a common basis for comparison.
Read more →
Heat pumps in commercial settings: Planning electricity demand and procurementA heat pump changes a company's electricity purchases. Here's how to link heat demand, electrical power, and supply contract before investing.
Read more →
SHARING KNOWLEDGE

CLARITY BEFORE SIGNING

You know the terms and conditions.
Before you sign.

We work with you to develop a solution tailored to your business, goals, and security needs. You'll receive our vetted recommendation, complete with comprehensive data and concrete offers. You'll see which price components are fixed, which are variable, and the criteria we use to select suppliers. We document all agreements with you in a transparent and easily understandable manner.

Discuss procurement

OPTUM in the community

What would you like to know?

Enter a term or choose an entry point.

No registration required. The search remains in your browser.